IATF 16949 from incoming material to final inspection, with the lot still traceable.
The quality system is built for automotive customers who require IATF 16949, process control, and traceability back to the lot. A UL material or insulation note on the drawing is carried in the same control plan.
Each lot is built and checked under IATF 16949, ISO 14001, and ISO 45001. Inspection runs from incoming material, through the process, to the final check. A nonconforming part is held, marked, and dispositioned before it moves on.
Process data stays with the lot for a later capability review. Internal audits follow the same flow.
- IATF 16949
- ISO 14001
- ISO 45001
- Incoming
- In-process
- Final
- Traceability